Browse the docs
Set up your simulator
Who fits a golf simulator: me, my builder, or your installation team?
The short answer
Any of the three. Most owners build a SimSpace package themselves in an afternoon. If the room is being built, your builder does the first fix from our brief. Or book our installation team: experienced simulator fitters who do floor, screen, padding, projector, launch monitor and PC and commission it with you, most rooms in two to three days.
Send our sim experts your room size or a photo. They’ll tell you what fits, free.
Check my room on WhatsAppIn summary
Three of the last five buyers we spoke to on a call asked the same thing: "do you install?" Since 5 November 2026 the answer is yes, if you want it. There are three routes. Build it yourself, which most owners do. Have your own builder do the room and first fix from our brief, then set the kit up yourself. Or book our installation team, experienced simulator fitters who take the room from bare floor to your first swing. This page sets out what each route involves, what we do in each, and what must be ready before anyone arrives.
Route 1: build it yourself
This is the route most of our customers take, and for a SimSpace room package it is an afternoon. SimSpace designs its enclosures to be built by two adults without tools: push-connect poles, velour panels on velcro straps, and the screen fixed from one corner and tightened with bungee toggles. SimSpace's product page says 20 to 30 minutes for the frame with two people, and its FAQ says the whole process should take no longer than 45 minutes. Plan on 45 for a first build.
The rest is placing and connecting: the mat with the hitting spot 2.5m from the screen, the projector on its mount with one HDMI lead, then the launch monitor and software. How to set up a home simulator gives the order on the day with a time for each step, and there is a guide for each unit, from the Garmin Approach® R50 to the Full Swing KIT. If you would rather not do the enclosure yourself, a handyman booked through Airtasker can follow the SimSpace sheet and video. That remains the cheapest pair of hands for the enclosure alone. Our sim experts answer questions by message at every step.
Route 2: your builder does the room, you do the kit
If the room is being built or refitted anyway, a garage conversion, a garden room, a new extension, the simulator only touches the builder's work at first fix: the leads, conduit and socket boxes that go in before the walls and ceiling are closed. Get those right and the kit drops in afterwards.
We give you a builder brief you can forward as it is. It covers four things: sockets where the projector, launch monitor and any PC will sit; an HDMI route from the picture source to the projector mount point on the ceiling, in 25mm conduit with a draw string so it can be swapped later; an Ethernet cable to the PC position if you will use a PC, and Wi-Fi tested where you will stand; and a screen wall with 30cm clear behind the screen and 8cm each side of the frame. The projector is ceiling mounted by default on the universal mount, so the fixing point and power at the mount are first-fix jobs too. First fix and the builder brief has the cable-by-cable table for each launch monitor, and cabling covers lengths and routes. For a garden room, the new circuit from the house is notifiable work, so use a registered electrician: see garden-room electrics.
On this route you, or your builder's team, still build the enclosure and connect the kit. If you would rather hand that over as well, that is route three.
Route 3: our installation team
We now offer professional installation through our simulator installation team: experienced fitters who build simulator rooms for a living, sub-contracted to us, with coverage across the UK. They take the room from floor to first swing:
- Underlay and turf across the floor, and the strike mat set in it.
- The impact screen tensioned on a frame.
- Padded walls either side, taken right to the wall, with a pelmet across the top between the padding.
- The projector on its mount, the launch monitor in the position its manual gives, and the PC if there is one.
- Commissioning with you before they leave: software connected, first shots hit, settings explained.
Most rooms take two to three days on site. The fit is priced per room on request, because every room is different, and it appears as its own line on your proposal so you can take it or leave it without changing the kit. Ask our sim experts for it when you send your room, or on the call.
What must be ready before they arrive
The fitters fit; they do not do building work or electrics. These four things need to be done before the booking, and they are the same four things the builder brief asks for:
- Power in the right places, fitted and tested: at the projector mount, at the hitting position, at the PC position, and behind the ball for a radar unit.
- The HDMI lead run with its ends at the projector mount point and at the picture source.
- Internet in the room for a PC: an Ethernet cable to the PC position, or Wi-Fi that has been tested where the PC will sit.
- A data cable to a ceiling-mounted unit if your launch monitor is one, as well as power at the ceiling.
Also check that the PC has the right output for the projector, HDMI or DisplayPort, and that every box has arrived and been checked against its box list. A missing lead or a projector that has not turned up costs a day on site, and that day is yours.
Which route for which room
Build it yourself if you are putting a SimSpace package into a finished garage or spare room: the enclosure is the work, and it is a tent frame, not joinery. Use your builder for first fix whenever the room is being built or replastered, whichever route you take for the kit. Book the installation team when you want a built-in look, padded walls and turf rather than a free-standing bay, when the room is finished and wired and you want it done in one visit, or when nobody in the house wants to spend a weekend on it.
Our steer: tell us which route you have in mind when you send your measurements for the free 3D design. The design is the same either way, but the builder brief and the installation line go on the proposal only when we know you want them.
The three fitting routes
| Route | What you do | What we do | Time | When it suits |
|---|---|---|---|---|
| 1. Build it yourself | Build the enclosure with a second adult, lay the mat, mount the projector, set up the launch monitor and software | Supply and deliver every part; design the room in 3D; answer questions by message at every step | Enclosure 20 to 30 minutes, up to 45 (SimSpace); the whole room an afternoon | A SimSpace package going into a finished room |
| 1b. Handyman for the enclosure | Book a handyman through Airtasker and send them the SimSpace sheet and video; you do the kit and software | As above | About the same, with hired hands | You want the frame built but are happy with the electronics |
| 2. Your builder, our brief | Forward our builder brief; your builder does sockets, HDMI to the ceiling mount point, Ethernet for a PC and the screen wall at first fix; you build and connect the kit | Write the brief for your room; design in 3D; support you on set-up day | First fix inside the build programme; kit set-up an afternoon once the room is finished | A garage conversion, garden room or extension being built or replastered |
| 3. Our installation team | Have power, HDMI, internet and any ceiling data cable in place; receive and check the kit | Underlay and turf, strike mat, screen on a frame, padded walls with a pelmet, projector, launch monitor, PC, commissioning with you; priced per room, its own line on the proposal | Most rooms 2 to 3 days on site | A built-in look with padded walls and turf, or one visit from bare floor to first swing |
Installation is quoted per room on request and added as its own line on your proposal. Electrics and building work are not part of it: they must be finished before the fitters arrive.
Best practice
- Decide the route before the designSay which route you want when you send your measurements, so the builder brief or the installation line is on the first proposal.
- Settle the projector position at first fixCeiling mounted by default on the universal mount, so the fixing point, HDMI end and power at the mount go in before the ceiling closes.
- Test the internet where the PC will sitSign-ins, updates and course downloads need it. An Ethernet cable to the PC position is the fix that never fails.
- Check every box before the fitters' dayTick each delivery off against its box list the day it arrives. A missing part found on site costs a day.
- Build with two adults if you do it yourselfSimSpace designs the enclosure for two people without tools. The top poles and the screen are much easier with someone on the other end.
Gotchas to avoid
- Expecting the fitters to do the electricsThey fit the simulator. Sockets, a new circuit and the HDMI run are the electrician's and builder's work, done before the booking.
- No data cable to a ceiling unitA ceiling-mounted launch monitor needs power and an Ethernet cable to the PC at the ceiling. Add both at first fix or the unit cannot be commissioned.
- A PC with the wrong outputThe projector takes HDMI. A PC with only DisplayPort needs an adapter or a different lead, so check the back of the PC before the fitting day.
- Plastering the HDMI lead inRun it in 25mm conduit with a draw string. A lead buried in plaster cannot be swapped when a longer or faster one is needed.
- Waiting for a price in the kit totalInstallation is not in any package price. It is quoted per room and sits on its own line, so ask for it rather than assume it is in.
Our recommendation
Build a SimSpace package yourself in a finished room; use your builder for first fix in any new room; book our installation team for a built-in fit-out done in one visit.
- If the room is finished and you are buying a SimSpace package
- Build it yourself with a second adult, or a handyman from Airtasker for the enclosure.
- If the room is being built or replastered
- Forward the builder brief now, before the ceiling closes, whichever route you choose for the kit.
- If you want padded walls, turf and a screen on a frame
- Ask for the installation team's price with your proposal; most rooms take two to three days on site.
- If you are booking the installation team
- Have power, HDMI ends, internet and any ceiling data cable in place, and every box checked, before the booking.
For the fit-out we'd pick…
The package most owners build themselvesGarmin Approach® R50 Home Golf Simulator Package - Complete Setup, UKNo PC, one HDMI lead and a SimSpace enclosure built by two adults without tools. Any of the three routes fits it.from£7,337.98
The ceiling mount in the builder briefUniversal Golf Simulator Projector MountCeiling or wall fixing with angle and tilt adjustment; the default projector position, so the fixing point and power go in at first fix.£39.99
The lead to run before the ceiling closes4K/8K HDMI 2.1 Cable 10m10m HDMI 2.1; not included in our SimSpace packages, and the fitters need its ends at the mount point and the picture source.£29.99
Questions people ask
Do you install golf simulators?
Yes, through our installation team: experienced simulator fitters, sub-contracted to us, covering the UK. They do underlay and turf, the strike mat, the screen on a frame, padded walls with a pelmet, projector, launch monitor and PC, and commission it with you. Most rooms take two to three days on site.
How much does installation cost?
It is priced per room on request, because rooms differ in size, travel and what is being fitted. It is added as its own line on your proposal, so you can take it or leave it without changing the kit. Ask our sim experts for it when you send your room.
Can my own builder fit it instead?
Yes. Forward our builder brief: sockets, an HDMI route to the ceiling mount point, Ethernet for a PC and a screen wall with 30cm clear behind the screen. That is all first-fix work. You or your builder's team then build the enclosure and connect the kit, with our set-up guides and support by message.
How long does the SimSpace enclosure take to build?
SimSpace's product page says 20 to 30 minutes for the frame with two people, and its FAQ says the whole process should take no longer than 45 minutes. No tools are needed. Plan on 45 for a first build, with the poles laid out in size order first.
What must be ready before your installation team arrives?
Power at the projector mount, hitting position, PC position and behind the ball for a radar unit; the HDMI lead with its ends at the mount point and the picture source; internet in the room for a PC; and power plus a data cable at the ceiling for a ceiling-mounted unit. All kit delivered and checked.
Does the installation team do electrics or building work?
No. They fit the simulator. Sockets, a new circuit, the conduit run and any plastering are the electrician's and builder's work, and must be finished before the booking. A garden room's new circuit is notifiable work, so use a registered electrician.
Still unsure? Ask our experts about this page on live chat or WhatsApp. Send your room size and they’ll tell you straight.
Ask an expert
